{"id":20210,"date":"2022-10-21T13:31:08","date_gmt":"2022-10-21T13:31:08","guid":{"rendered":"https:\/\/peymantaeidi.net\/stem-cell\/?p=20210"},"modified":"2022-10-21T14:09:48","modified_gmt":"2022-10-21T14:09:48","slug":"moses-lake-to-gain-hundreds-of-jobs-tied-to-ev-batteries","status":"publish","type":"post","link":"https:\/\/peymantaeidi.net\/stem-cell\/2022\/10\/21\/moses-lake-to-gain-hundreds-of-jobs-tied-to-ev-batteries\/","title":{"rendered":"Moses Lake to gain hundreds of jobs tied to EV batteries"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/peymantaeidi.net\/stem-cell\/wp-content\/uploads\/2022\/10\/default-2022.jpg\" class=\"ff-og-image-inserted\" alt=\"image\" \/><\/div>\n<section class=\"article-content container px-lg-7\">\n<div class=\"mx-lg-7 px-lg-5 px-xl-7\">\n<p>SPOKANE \u2014 The U.S. Department of Energy has awarded $200 million to a pair of companies planning to build factories in Moses Lake that would employ hundreds of people to develop and produce battery materials for use in electric vehicles.<\/p>\n<p>Group14 Technologies Inc., based in Woodinville, and Sila Nanotechnologies, headquartered in Alameda, Calif., will each receive $100 million grants.<\/p>\n<p>Sila Nanotechnologies bills itself as a next-generation battery materials company that is investing $300 million of its own financing, along with the $100 million grant, to renovate an existing 600,000-square-foot building where it will produce silicon anode materials, which the company says are a cheaper, more efficient alternative to graphite anodes typically used in electric vehicle batteries.<\/p>\n<p>Sila estimates it will produce 20 gigawatts of capacity from these materials within four years from its 160-acre Moses Lake campus by 2026, enough to power more than 200,000 electric vehicles.<\/p>\n<p>Mercedes-Benz will be the facility\u2019s first commercial customer and has selected Sila\u2019s anode materials for use in its G-Class series of electric vehicles, according to a company release.<\/p>\n<\/p><\/div>\n<\/section>\n<div class=\"article-inline advertisement my-6\">\n<div class=\"container-fluid text-center my-6\">\n<\/div><\/div>\n<section class=\"article-content container px-lg-7\">\n<div class=\"mx-lg-7 px-lg-5 px-xl-7\">\n<p>Sila anticipates hiring 150 to 300 workers for the plant. It will be partnering with local high schools and vocational training programs as well as Big Bend Community College and Columbia Basin College to recruit and train employees.<\/p>\n<p>Sila chose to open a plant in Moses Lake based on the area\u2019s access to hydropower and other factors, said Steve Driskill, Sila\u2019s vice president of general counsel.<\/p>\n<p>\u201cWe did a nationwide search to find one of the best places to manufacture our product and Moses Lake checked all the boxes for us,\u201d he said.<\/p>\n<p>Sila is currently in the design phase for its Moses Lake plant with plans to begin renovations of the existing building by mid-2023. The company anticipates initial production of silicon anode materials to begin in 2025, Driskill said.<\/p>\n<p>Sila will initially operate within the existing 600,000-square-foot building, but its goal is to expand operations on the 160-acre site, Driskill said.<\/p>\n<\/p><\/div>\n<\/section>\n<div class=\"article-inline advertisement my-6\">\n<div class=\"container-fluid text-center my-6\">\n<\/div><\/div>\n<section class=\"article-content container px-lg-7\">\n<div class=\"mx-lg-7 px-lg-5 px-xl-7\">\n<p>\u201cWe are the first and, so far, the only company to have silicon (anode) material that\u2019s sold commercially,\u201d Driskill said. \u201cWe have product. We have demand. This additional funding is going to help us scale faster.\u201d<\/p>\n<p>Group14 Technologies, a silicon battery technology manufacturer and supplier, is investing $223 million of its own funds, in addition to the $100 million Department of Energy grant to build a battery-active materials plant that will produce silicon-carbon composite anodes for lithium-ion batteries.<\/p>\n<p>The factory will have two 2,000-ton-per-year manufacturing modules capable of powering about 100,000 electric vehicles, according to a company release.<\/p>\n<p>Group14 expects to create 300 jobs with plant construction and an additional 200 technical jobs to sustain production. The company opened its first commercial-scale battery-active materials factory in Woodinville in April 2021.<\/p>\n<p>\u201cWe expect to be online with our first module in our BAM-2 factory by the end of 2023,\u201d Rick Constantino, co-founder and chief technology officer of Group14, said in an email. \u201cOnce our first module is online, we will continue to build additional modules to meet increasing customer demand.\u201d<\/p>\n<\/p><\/div>\n<\/section>\n<div class=\"article-inline cta my-6\">\n<div class=\"container subscribe-cta hide-for-digital-subscribers\">\n<div class=\"d-md-flex align-items-center p-5 border-top border-bottom border-light\">\n<div class=\"h5 font-headline mb-4 mb-md-0 text-dark\">\n\t\t\tThe Columbian is becoming a rare example of a news organization with local, family ownership.<br \/>\n\t\t\tSubscribe today to support local journalism and help us to build a stronger community.\n\t\t<\/div>\n<div class=\"ml-md-5 text-center\">\n\t\t\t<a href=\"https:\/\/www.columbian.com\/subscribe\/\" class=\"btn btn-lg btn-columbian-faded btn-arrow\">Subscribe Today<\/a>\n\t\t<\/div>\n<\/p><\/div>\n<\/div><\/div>\n<section class=\"article-content container px-lg-7\">\n<div class=\"mx-lg-7 px-lg-5 px-xl-7\">\n<p>In May, Group14 raised $400 million in a funding round led by Porsche AG that will go toward building its Moses Lake factory.<\/p>\n<p>The Moses Lake projects are among 20 in 12 states that received a total of $2.8 billion in grants from the Bipartisan Infrastructure Law to expand domestic battery manufacturing for electric vehicles.<\/p>\n<p>The federal investment, when matched by the recipients, will total more than $9 billion that will go toward boosting clean energy technology.\n\t\t\t<\/p>\n<\/div>\n<\/section>\n<div class=\"px-3\">\n<div class=\"article-inline advertisement my-6\">\n<div class=\"container-fluid text-center my-6\">\n<\/div><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>SPOKANE \u2014 The U.S. Department of Energy has awarded $200 million to a pair of<\/p>\n","protected":false},"author":1,"featured_media":20212,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/posts\/20210"}],"collection":[{"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/comments?post=20210"}],"version-history":[{"count":2,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/posts\/20210\/revisions"}],"predecessor-version":[{"id":20213,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/posts\/20210\/revisions\/20213"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/media\/20212"}],"wp:attachment":[{"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/media?parent=20210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/categories?post=20210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/peymantaeidi.net\/stem-cell\/wp-json\/wp\/v2\/tags?post=20210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}